Operational Impacts of Integrating Wind Generation into Idaho Power's Existing Resource Portfolio
January, 2007
by EnerNex Corporation for Idaho Power Company
The objective of this study is to assess the costs that could be incurred by Idaho Power in modifying its operations at the Hells Canyon Complex for “integrating” or incorporating wind energy onto its system.
The intermittent and unpredictable nature of wind generation requires a utility to have generating resources available which can increase or decrease generation on short notice in order to keep the interconnected power system balanced. While hydroelectric power plants are well suited for performing this function, there are operational impacts and costs associated with operating Idaho Power hydroelectric plants in a manner that maintains reliability and facilitates integration of energy from wind generation facilities.
The issues surrounding the integration of wind generation on interconnected power systems are numerous and complex. This study provides a first step toward understanding those issues.
The intermittent and unpredictable nature of wind generation requires a utility to have generating resources available which can increase or decrease generation on short notice in order to keep the interconnected power system balanced. While hydroelectric power plants are well suited for performing this function, there are operational impacts and costs associated with operating Idaho Power hydroelectric plants in a manner that maintains reliability and facilitates integration of energy from wind generation facilities.
The issues surrounding the integration of wind generation on interconnected power systems are numerous and complex. This study provides a first step toward understanding those issues.
Also filed under [
Technology|
Idaho]
Jon Boone addresses wind power for the Mid-Atlantic region.
A Critical Evaluation of the Energy Plans and Actions Announced in April 2007
June 12, 2007
by Glenn R. Schleede, Round Hill (VA)
This brief paper reviews and evaluates key aspects of energy policies and plans announced by New York State officials, and contrasts their electricity plans with those of the New York Independent System Operator (NYISO) which is responsible for the reliability of New York's electricity grid. Both sets of plans have major implications for the people of New York.
Also filed under [
Tax Breaks & Subsidies|
New York]
A guide to calculating the carbon dioxide debt and payback time for wind farms
July, 2006
by Dr M J Hall, FRSC, FIBiol for Renewable Energy Foundation
It is broadly accepted that wind turbines do not emit CO2 at the point of generation. However, in common with all types of power station, it is emitted during their construction and, through damage directly inflicted on the construction site, over a much longer period. The total debt will vary from site to site but will comprise some or all of the following;
• Emissions arising from fabrication (steel smelting, forging of turbine columns, the manufacture of blades and the electrical and mechanical components);
• Emissions arising from construction (transportation of components, quarrying, building foundations, access tracks and hard standings, commissioning);
• The indirect loss of CO2 uptake (fixation) by plants originally on the surface of the site but obliterated by construction activity including the destruction of active bog plants on wet sites and deforestation;
• Emissions due to the indirect, long-term liberation of CO2 from carbon stored in peat due to drying and oxidation processes caused by construction of the site.
It is important to recognise that peat is a major store of carbon accumulated from dead plant remains over many millennia. It is held in perpetuity because the bog’s wetness and acid conditions prevent the access of oxygen and inhibit the growth of bacteria which would otherwise rot the vegetation. Draining peat for construction reverses both these long-term processes: the soil is exposed to the air, the carbon is converted to CO2 and released slowly to the atmosphere.
Several papers from the wind industry in Denmark and the UK have addressed the first two points with estimates of payback time ranging from about six to 30 months.
However, the industry rarely, if ever, considers the last two. This is a fundamental omission as their contribution to the overall CO2 debt, in particular the last, can be far greater than all the others put together. This paper outlines a procedure for quantifying it.
The guide has been prepared to enable anyone with access to the Environmental Statement (ES) that forms part of a Planning Application (PA) for a wind farm to estimate its CO2 debt. (If some of the requisite information proves to be unavailable, this ought to provide grounds for postponing consideration of the application and the commissioning of further assessment.)
The results of the calculations described should be submitted to planning authorities or Public Inquiries as part of the arguments used in assessing the merits and demerits of an application.
• Emissions arising from fabrication (steel smelting, forging of turbine columns, the manufacture of blades and the electrical and mechanical components);
• Emissions arising from construction (transportation of components, quarrying, building foundations, access tracks and hard standings, commissioning);
• The indirect loss of CO2 uptake (fixation) by plants originally on the surface of the site but obliterated by construction activity including the destruction of active bog plants on wet sites and deforestation;
• Emissions due to the indirect, long-term liberation of CO2 from carbon stored in peat due to drying and oxidation processes caused by construction of the site.
It is important to recognise that peat is a major store of carbon accumulated from dead plant remains over many millennia. It is held in perpetuity because the bog’s wetness and acid conditions prevent the access of oxygen and inhibit the growth of bacteria which would otherwise rot the vegetation. Draining peat for construction reverses both these long-term processes: the soil is exposed to the air, the carbon is converted to CO2 and released slowly to the atmosphere.
Several papers from the wind industry in Denmark and the UK have addressed the first two points with estimates of payback time ranging from about six to 30 months.
However, the industry rarely, if ever, considers the last two. This is a fundamental omission as their contribution to the overall CO2 debt, in particular the last, can be far greater than all the others put together. This paper outlines a procedure for quantifying it.
The guide has been prepared to enable anyone with access to the Environmental Statement (ES) that forms part of a Planning Application (PA) for a wind farm to estimate its CO2 debt. (If some of the requisite information proves to be unavailable, this ought to provide grounds for postponing consideration of the application and the commissioning of further assessment.)
The results of the calculations described should be submitted to planning authorities or Public Inquiries as part of the arguments used in assessing the merits and demerits of an application.
Eric Rosenbloom, a resident of Vermont's Northeast Kingdom, addresses why wind power does not live up to advocates' claims, why its impact on the environment and people's lives is far from benign and how money invested in wind energy could be better spent.
Also filed under [
Impact on People|
Vermont]
An Economic Analysis of a Wind Farm in Nantucket Sound
May 15, 2004
by Beacon Hill Institute at Suffolk University
Written by Douglas Giuffre, Jonathan Haughton, David Tuerck and John Barrett, this report analyses in economic terms the costs and benefits of a proposed 130 turbine wind plant in Nantucket Sound. It concludes that the economic costs substantially exceed the associated economic gains. This is a follow-up study to one published by Beacon Hill in October 2003 entitled "Blowing in the Wind: Offshore Wind and the Cape Cod Economy"
Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006
May 31, 2007
by Ryan Wiser and Mark Bolinger, Lawrence Berkeley National Laboratory
DOE released its first Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006 on May 31st, providing an overview of developments and trends in the U.S. wind power market. The report analyzes trends in the marketplace, including wind power prices compared to wholesale electricity prices, project costs, turbine sizes, and developer consolidation. It also describes the increasing performance of wind projects, current ownership and financing structures, and trends among major wind power purchasers.
The report notes that U.S. wind power capacity increased by 27 percent in 2006 and that the United States had the fastest-growing wind power capacity in the world in 2005 and 2006. For the second straight year, the United States led the world by installing 2,454 megawatts of wind power capacity in 2006—16 percent of the capacity installed worldwide that year—followed by Germany, India, Spain, and China. Leading the way in annual growth capacity in the United States are Texas, Washington, and California.
The report notes that U.S. wind power capacity increased by 27 percent in 2006 and that the United States had the fastest-growing wind power capacity in the world in 2005 and 2006. For the second straight year, the United States led the world by installing 2,454 megawatts of wind power capacity in 2006—16 percent of the capacity installed worldwide that year—followed by Germany, India, Spain, and China. Leading the way in annual growth capacity in the United States are Texas, Washington, and California.
Annual Report: Capital Grant Scheme for the North Hoyle Offshore Wind Plant
July 1, 2005
by npower Renewables Limited
Built in 2003, North Hoyle is the UK's first major offshore wind plant.....
Also filed under [
Technology|
UK]
“Hot & Cold Media Spin: A Challenge To Journalists Who Cover Global Warming”
September 25, 2006
by Senator James Inhofe, Chairman, Senate Environment and Public Works Committee
This is the pdf version with charts of Sen. Inhofe's speech. The full text version of the speech is available via the link below.
Blue Ribbon Panel on Development of Wind Turbine Facilities in Coastal Waters- Interim Report
November, 2005
by Blue Ribbon Panel appointed by Acting Governor Richard J. Codey
"Offshore wind power development has potential to generate a series of quantifiable environmental benefits. These benefits appear significant in both absolute and monetized terms, but are arguably marginal relative to the scale of existing energy production and emissions affecting New Jersey's environmental and natural resources. Offshore wind power development also presents a series of potential environmental costs. In the absence of a developed literature, the scale of many of these costs are not readily quantified or monetized, making the nature of these impacts highly uncertain and necessitating additional research." (page 70)
Also filed under [
New Jersey]