Documents
Category:
Impact on Wildlife and Impact on Birds
Browse in :
All
> Topics
> Impact on Wildlife
(130)
All > Topics > Impact on Wildlife > Impact on Birds (76)
Any of these categories
All > Topics > Impact on Wildlife > Impact on Birds (76)
Any of these categories
HMANA Industrial wind turbine siting and monitoring policy
July 8, 2007
by Hawk Migration Association of North America
The following policy update was adopted by the HMANA Board of Directors on July 8, 2008.
Also filed under [
USA]
Results of bat and bird mortality at the expanded Buffalo Mountain windfarm, 2005
June 28, 2007
by J. K. Fiedler, T. H. Henry, R. D. Tankersley, and C. P. Nicholson for Tennessee Valley Authority
The post-construction bird/bat mortality survey at the expanded Buffalo Mountain windfarm found an adjusted bat mortality rate of 63.9 bats/turbine/year. This figure is similar in magnitude to the bat mortality recorded in West Virginia (47.5 bats/turbine/year). Fewer bird strikes were recorded in this same survey.
Also filed under [
Impact on Bats|
Tennessee]
Maple Ridge Wind Power Avian and Bat Fatality Study Year One Report FINAL REPORT
June 25, 2007
by Aaftab Jain et al, Curry and Kerlinger, LLC
The following report describes the research design, initiation and completion of the first
year of postconstruction study (fall migration only) of avian and bat collision fatalities at the 120 turbine
Maple Ridge Wind Power Project in Lewis County, New York.
The work was conducted in accordance with the “Proposed Scope of Work for a Postconstruction Avian and Bat Fatality Study at the Maple Ridge Wind Power Project, Lewis County, New York” dated March 14, 2006, and agreed upon in mid-May 2006, after several revisions. People/agencies who reviewed the proposed scope of work included staffers from the U. S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (ACE), Environmental Design and Research (EDR), NYS DEC staffers, developers (PPM and Horizon), and others. Representatives from some or all of these groups have been included in a Technical Advisory Committee (TAC), which has the responsibility of reviewing and commenting on progress reports, annual reports, and other updates from this project.
The work was conducted in accordance with the “Proposed Scope of Work for a Postconstruction Avian and Bat Fatality Study at the Maple Ridge Wind Power Project, Lewis County, New York” dated March 14, 2006, and agreed upon in mid-May 2006, after several revisions. People/agencies who reviewed the proposed scope of work included staffers from the U. S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (ACE), Environmental Design and Research (EDR), NYS DEC staffers, developers (PPM and Horizon), and others. Representatives from some or all of these groups have been included in a Technical Advisory Committee (TAC), which has the responsibility of reviewing and commenting on progress reports, annual reports, and other updates from this project.
Comments: Statewide Guidelines for Reducing Wildlife Impacts from Wind Energy Development (Docket No. 06-011-1)
June 18, 2007
by Dan Boone
Comments submitted to the California Energy Commission regarding proposed guidelines for conducting post-construction bird-bat mortality surveys at wind energy facilities. These comments were submitted by Dan Boone, a wildlife biologist with over 30 years professional experience.
Also filed under [
Impact on Bats|
California]
The New York State Department of Environmental Conservation (DEC) reviewed the Draft Generic Environmental Impact Statement (DGEIS) for PPM's Horse Creek wind facility proposed for the New York towns of Clayton and Orleans, Jefferson County. The project consists of approximately 62 wind turbines (130 MW) with 54 turbines in the Town of Clayton and 8 turbines in the Town of Orleans. The project scope also includes construction of two permanent meteorological (met) towers, an operations and maintenance facility, approximately 16 miles of gravel access roads and approximately 28 miles of buried electric collection lines, and an interconnection substation adjacent to the existing electric transmission line.
Biological Survey responds to PA Game Commission wind energy voluntary cooperation agreement
May 31, 2007
by Pennsylvania Biological Survey
This report, authored by the Wind Energy and Bats subcommittee to the Pennsylvania Biological Survey's (PaBS) Mammal Technical Committee, documents the PA Game Commission's direct side-stepping of a long-established memorandum of agreement with the PaBS when the Game Commission developed and finalized the Wind Energy Voluntary Cooperation Agreement without the review or input of the Biological Survey. The memorandum of agreement was created over 10 years ago to help ensure that the Game Commission obtained advice from experts about actions affecting the mammals inhabiting the Commonwealth.
Also filed under [
Impact on Bats|
Pennsylvania]
The possible effects of wind energy on Illinois birds and bats
May, 2007
by Illinois Department of Natural Resources
Report of the Illinois Department of Natural Resources to Governor Rod Blagojevich and the 95th Illinois General Assembly.
Also filed under [
Impact on Bats|
Illinois]
Bird and Bat Studies Conducted at Proposed or Existing Windpower Facilities
February, 2007
by Pennsylvania Department of Conservation and Natural Resources
This document includes studies in Maine, Maryland, Minnesota, New Hampshire, New York, Pennsylvania, Vermont, Virginia and West Virginia.
Also filed under [
Impact on Bats|
Maryland|
Maine|
Minnesota|
New Hampshire|
New York|
Pennsylvania|
Virginia|
Vermont|
West Virginia]
Lempster Mountain Wind Power Project: Direct Pre-filed Testimony of Lisa Linowes
February 7, 2007
by Lisa Linowes
Why did you petition to become an intervenor in this matter before the NH SEC?
With New Hampshire’s recent reinstatement of PILOT agreements and legislative efforts to a Renewable Portfolio Standard, the regulatory groundwork is being laid for more wind facilities to enter the state. Yet, New Hampshire, like many states, has no consistent regulatory process in place for reviewing these projects to ensure our environmental, societal, and economic interests are protected. The work the NH SEC has agreed to undertake in reviewing this application is precedent setting. How the committee approaches its review and the weight it places on arguments presented by all sides will impact other developments in the State as pertains to renewable energy projects.
There are a multitude of conflicting issues at play when considering any wind project. My commitment to this process is to help provide, to the best of my ability, valuable and timely information that will assist the Committee in making an informed decision on this application.
Also filed under [
General|
Impact on Landscape|
Pollution|
Impact on Space|
Energy Policy|
New Hampshire]
USFWS Letter to UPC Re. Proposed Sheffield Wind Plant
January 3, 2007
by Michael J. Bartlett, Supervisor, New England Field Office
As a general comment, the Service appreciates the fact that UPC Wind has conducted radar and acoustic studies on bird and bat migration and bat activity at Hardscrabble Mountain and other locations at or near the proposed project. We believe the radar, visual, and acoustic information contained in the above-referenced reports is useful, but that it is not sufficient to demonstrate, at an appropriate scale, the spatial and temporal uses of the airspace over Granby, Libby, Barrett, and Norris Mountains by birds, bats, and insects.