Documents
Category:
Technology or West Virginia
Browse in :
All
> Topics
> Technology (58)
All > Location > USA > West Virginia (22)
All of these categories
All > Location > USA > West Virginia (22)
All of these categories
USFWS comments on Pinnacle Wind Power Project
November 6, 2009
by Deborah Carter, USFWS Field Supervisor
US Fish and Wildlife Service, Wet Virginia field office, issued these comments regarding the Pinnacle wind power project proposed for ridgelines in Mineral County, WV. The comments pertain to the Habitat Characterization and Assessment of Rare, Threatened, and Endangered Species for the Pinnacle Wind Farm (BHE Environmental 2009a); the Avian Risk Assessment for the Pinnacle Wind Power Project (Kerlinger 2009); and the Bat Risk Assessment: Pinnacle Wind Farm (BHE Environmental 2009b). Excerpts of the letter are provided below. The full report can be accessed by clicking on the link at the bottom of the page.
The Animal Welfare Institute, Mountain Communities for Responsible Energy, and others submitted this pretrial brief and supporting reply briefs in their law suit opposing the Beech Ridge wind energy facility to be located in Greenbrier County, West Virginia. These briefs show that the developer, Beech Ridge Energy LLC, discovered the presence of the federally endangered Indiana Bat at the project site but withheld this information from federal and state authorities. With this information hidden from public inspection, the project was granted a siting certificate from the West Virginia Public Service Commission to construct up to 124 wind turbines, each 390 feet tall, along a twenty-three mile stretch of land on forested Allegheny Mountain ridgelines. Construction commence in early 2009 but a subsequent injunction request was filed by the plaintiffs and granted pending the outcome of this law suit. The pre-trial brief and reply briefs by renown bat experts Drs. Lynn Robbins, Michael Gannon and Thomas Kunz can be accessed by clicking on the links below. The introduction to the reply brief is also posted below. The trial is scheduled from October 21 before the United States District Court for the District of Maryland.
Animal Welfare Institute et.al. motion for preliminary injunction against the Beech Ridge wind energy facility
July 10, 2009
by Meyer Glitzenstein & Crystal
The Animal Welfare Institute, Mountain Communities for Responsible Energy and David G. Cowan have filed a law suit against Beech Ridge Energy LLC and Invenergy Wind LLC under the federal Endangered Species Act ("ESA"). This filing seeks preliminary injunction to halt further construction, turbine erection, and operation of the Beech Ridge industrial wind power project. The plaintiffs argue that the project, if constructed, will result in the "likely killing, injury, and other forms of "take" of endangered Indiana bats in violation of the ESA." The wind project is proposed to be located on ridgelines in Greenbrier County, West Virginia.
WV-PSC decision: AES Laurel Mountain, LLC wind energy proposal
November 25, 2008
by West Virginia Public Service Board
At a session of the PUBLIC SERVICE COMMISSION OF WEST VIRGINIA in the City of Charleston on the 26th day of November, 2008.
CASE NO. 08-0109-E-CS
AES Laurel Mountain, LLC, a limited liability
company, Arlington, Virginia.
Application for a siting certificate to authorize the construction
and operation of a wholesale electric generating facility in
Barbour and Randolph Counties, West Virginia. The full order can be downloaded by clicking on the web link at the bottom of this page.
Decommissioning costs and scrap value: Beech Ridge wind energy facility
October 6, 2008
by Tom Hewson
Tom Hewson of Energy Ventures Analysis, Inc. ("EVA") was hired by the citizen's group, Mountain Communities for Responsible Energy, to evaluate a Decommissioning Cost Report prepared for the Beech Ridge Energy Project - a 124-turbine project proposed for Greenbrier County, West Virginia. His summary below provides insight into what communities and permitting agencies should be looking for when evaluating decommissioning plans. Mr. Hewson's memo on decommissioning of the Beech Ridge wind facility, which was included in the public record before the West Virginia Public Service Commission on the project, can be accessed by clicking on the link below.
Also filed under [
Energy Policy|
West Virginia]
This document provides before and after aerial photos of the very southern end of the NedPower wind facility, the most recently constructed wind energy facility in the mid-Atlantic region. The project is comprised of 132 2-MW Gamesa wind turbines, each nearly 400 feet tall. Extensive clearing of forest was done to install the turbines and other project infrastructure. The average width of the area bulldozed for road corridor varies from about 75 to 100 feet.
Testing the effectiveness of an experimental acoustic bat deterrent at the Maple Ridge wind farm
June 24, 2008
by Horn, Arnett, Jensen, and Kunz
This paper documents the results of an in-field test at the Maple Ridge wind energy facility in New York to determine the effectiveness of using an experimental acoustic bat deterrent to reduce bat mortality. The executive summary excerpted below suggests the results were inconclusive. Most bat experts remain unconvinced that acoustic deterrence will be a suitable mitigation approach to reduce bat fatalities at existing turbines.
This important letter by Rep. Mollohan (D-WV) to the WV division of energy, comments on the agency's proposed State energy plan as it pertains to industrial wind energy development.
Also filed under [
General|
West Virginia]
California ISO integration of renewable resources report (Draft)
August, 2007
by CA-ISO, GE Energy Consulting, Pacific Northwest National Laboratory, AWS Truewind
This report details transmission and operating issues and recommendations for integrating renewable resources on the CAISO Control Grid. The CAISO discusses the gross variations in electric production from wind energy due to the intermittent nature of the resource. During periods of highest demand, the winds drop off.
Ecological impacts of wind energy development on bats: questions, research needs, and hypotheses
August 6, 2007
by Thomas H. Kunz et al
This important peer-reviewed paper written by bat expert Dr. Thomas H. Kunz et al identifies the significant risk wind turbines pose for migratory and local bat populations in the mid-Atlantic Highlands region of the United States. The projected number of annual fatalities of bats at wind energy facilities in the Highlands in the year 2020 can reach up to 111,000 bats.