Notice Letter to Town of Londonderry and Overview of Proposed Glebe Mountain Wind Project
December, 2005
by Robert Charlebois, Manager, Glebe Mountain Wind Energy LLC
The wind turbine array will be located within a 1200 foot wide Project corridor that extends
approximately 3.7 miles along the Glebe Mountain ridge.
Editor's Note: The cover letter is provided below. The pdf file provides an overview of the proposed project. Photos of the preliminary site plan and the overall facilities plan follow the cover letter. Both are also available in NWW's photo gallery.
Also filed under [
Vermont]
Contact informtion for Governor Douglas, the Vermont Public Service Board as well as state representatives and senators for the communities affected by the proposed wind plant on Glebe Mountain, Londonderry, Vermont.
Baileyville Wind Farm Development Issues
November 30, 2005
by Tom Hewson, Energy Ventures Analysis Inc
Tom Hewson takes a very comprehensive look at the development issues associated with the proposed Baileyville Wind Farm in Illinois.
Final Generic Environmental Impact Statement Ecogen, LLC Prattsburgh/Italy Wind Farm (NY)
November 22, 2005
by Numerous consultants for the Steuben County Industrial Development Agency
This Final Generic Environmental Impact Statement (FGEIS) has been prepared for the
Ecogen, LLC (Ecogen) Prattsburgh/Italy Wind Farm Project (Project) on the behalf of the Lead
Agency, the Steuben County Industrial Development Agency (SCIDA). The FGEIS is prepared
pursuant to the New York State Environmental Quality Review Act (SEQR), Environmental
Conservation Law, Article 8, 6NYCRR Part 617, and its implementing regulations.
Also filed under [
General|
Impact on Wildlife|
Impact on Landscape|
Impact on People|
Impact on Economy|
Safety|
New York]
Planning for Wind Power Developments in Hilltown Communities
November, 2005
by By Lloyd Crawford, Planning Board and Wind Study Committee, town of Hawley
The Hawley Wind Study Committee was established by town meeting vote and was directed to issue a report to the selectmen. Interested citizens were asked to submit a letter of interest to selectmen who then selected the committee. The committee first examined potential positive financial benefits to the town. Community based wind development was explored for a piece of town-owned land with the assistance of the UMass Renewable Energy Resource Lab. The committee determined that development of the site was not feasible. Lengthily discussions on the associated various negative impacts of wind plants followed. It was determined that our current bylaws would not require any form of local review to minimize these impacts. A report outlining the above was provided to the selectmen concluding that the appropriate course of action was to establish a wind power bylaw.
Also filed under [
Massachusetts]
Proposed Hawley (MA) Wind Facility Bylaw
October 27, 2005
by Hawley Planning Board for consideration at Special Town Meeting on 10/27/05
The purposes of this wind-generated energy production facilities section are to:
A. Protect the scenic, historic, environmental, and natural or man-made resources of the community without prohibiting alternative energy technologies to be developed.
B. Provide standards and requirements for regulation, placement, construction, monitoring, design, modification and removal of wind facilities.
C. Provide a procedural basis for action within a reasonable period of time for request for authorization to place, construct, operate, or modify wind facilities.
D. Preserve property values.
E. Locate wind facilities so that they do not have negative impacts such as, but not limited to, attractive nuisance, noise, falling objects, general safety, welfare and quality of life, wildlife and the environment in the community.
F. Require owners of wind facilities to configure them so as to minimize and mitigate the adverse impact of the wind facilities.
Also filed under [
Massachusetts]
Reply Submitted By The Kingdom Commons Group to Vermont's Public Service Board re. East Haven
October 27, 2005
by Kingdom Commons Group
There is no question in this proceeding that EMDC bears the burden of proof with regard to each of the criteria for a Certificate of Public Good ("CPG") under 30 V.S.A. Section 248. See In Re: Petition of Tom Halnon, 174 Vt 514; 811A. 2d 161, (August 20, 2002); Petition of Vermont Gas Systems, Inc., Docket No. 5314 at p.17 (August 2, 1989); Petition of Champlain Pipeline Company, Docket No. 5300 at p. 32-33 (August 21, 1989); Petition of David and Jan Blittersdorf, CPG NM-11 at p. 3 (May 26, 2000). ("The Board has consistently held in cases under Section 248 that the burden of proof is on the applicant.")
Also filed under [
Vermont]
Jurisdictional Ruling by Vermont's Environmental Board
October 6, 2005
by District Environmental Commission, Springfield, Vermont
The Windham Regional Commission asked the District Environmental Commission if the proposed commercial wind energy development on Glebe Mountain requires an an Act 250 amendment as well as a permit under Section 248 (30 V.S.A Section 248).
Act 250 is designed to protect Vermont's ridgelines above 2500'. Section 248 authorizes the Public Service Board to issue 'Certificates of Public Good' for electricity generating projects.
The District Environmental Commission concluded that construction of the wind measurement towers and the proposed wind energy project represent material and substantial changes to existing Act 250 permits and thus require an amendment.
Also filed under [
Impact on Landscape|
Vermont]
Site Plan Review Application to Huron County Planning Board
September 2, 2005
by Noble Thumb Wind Park I
The project will consist of approximately 32 wind turbines and associated access roads, a collection system, substations and associated equipment. Each turbine pedestal will occupy an area approximately 50' square......
Also filed under [
Michigan]
Culminating three years of study, the Planning Commission of Londonderry (VT) revised Londonderry's Town Plan to prohibit industrial wind turbines on Glebe Mountain. The revised Town Plan was submitted to the Londonderry Select Board on August 30, 2005 and approved by the Select Board on October 5, 2005.
Included here are selected themes and extracts from Londonderry's Town Plan.