The Visual Issue - An Investigation into the Techniques and Methodology used in Windfarm Computer Visualisations
March, 2007
by Alan Macdonald
This document does not question whether we should be developing windfarms or should not be
developing windfarms, or even whether they look good on a landscape or are a visual intrusion on
the landscape. We are simply addressing the methodology used by the windfarm industry, who
in our opinion, have been using misleading methods for the last 11 years whilst seeking to obtain
planning permission.
Having had more than 15 years experience in producing visualisations for planning applications, both here and in other parts of the world, what we see happening throughout Scotland and the rest of the UK is a method of visual presentation which brings our profession into disrepute. After many years of fighting for fairer standards, something has to be done because of the growing public perception that photomontage is unreliable.
Having had more than 15 years experience in producing visualisations for planning applications, both here and in other parts of the world, what we see happening throughout Scotland and the rest of the UK is a method of visual presentation which brings our profession into disrepute. After many years of fighting for fairer standards, something has to be done because of the growing public perception that photomontage is unreliable.
Also filed under [
Impact on Landscape|
Impact on Views]
Link to recent program aired in the UK
An indictment of the Scottish Executive and regulatory incompetence and indifference......‘One is left with a clear impression of inertia, bungling, duplicity, poor communication, procrastination, obfuscation and, quite frankly, shoddy and incorrect decision-taking both in temporal and technical terms'.
Also filed under [
Impact on People|
Noise]
Noise Radiation from Wind Turbines Installed Near Homes: Effects on Health
January, 2007
by Barbara J. Frey and Peter J. Hadden
Wind turbines are large industrial structures that create obtrusive environmental noise pollution when built too close to dwellings. This annotated review of evidence and research by experts considers the impact of industrial-scale wind turbines suffered by those living nearby. First, the paper includes the comments by some of the families affected by wind turbines, as well as coverage in news media internationally. The experiences described put a human face to the science of acoustics.
Second, the paper reviews research articles within the field of acoustics concerning the acoustic properties of wind turbines and noise. The acoustic characteristics of wind turbines are complex and in combination produce acoustic radiation. Next, the paper reviews the health effects that may result from the acoustic radiation caused by wind turbines, as well as the health effects from noise, because the symptoms parallel one another. Primarily, the consequent health response includes sleep deprivation and the problems that ensue as a result. In addition, this paper reviews articles that report research about the body's response not only to the audible noise, but also to the inaudible components of noise that adversely affect the body's physiology. Research points to a causal link between unwanted sound and sleep deprivation and stress, i.e., whole body physiologic responses.
These injuries are considered in the context of Human Rights, where it is contended that the environmental noise pollution destroys a person's effective enjoyment of right to respect for home and private life, a violation of Article 8 of the European Court of Human Rights Act. Furthermore, the paper considers the consequent devaluation of a dwelling as a measure of part of the damage that arises when wind turbines are sited too close to a dwelling, causing acoustic radiation and consequent adverse health responses.
The review concludes that a safe buffer zone of at least 2km should exist between family dwellings and industrial wind turbines of up to 2MW installed capacity, with greater separation for a wind turbine greater than 2MW installed capacity.
Second, the paper reviews research articles within the field of acoustics concerning the acoustic properties of wind turbines and noise. The acoustic characteristics of wind turbines are complex and in combination produce acoustic radiation. Next, the paper reviews the health effects that may result from the acoustic radiation caused by wind turbines, as well as the health effects from noise, because the symptoms parallel one another. Primarily, the consequent health response includes sleep deprivation and the problems that ensue as a result. In addition, this paper reviews articles that report research about the body's response not only to the audible noise, but also to the inaudible components of noise that adversely affect the body's physiology. Research points to a causal link between unwanted sound and sleep deprivation and stress, i.e., whole body physiologic responses.
These injuries are considered in the context of Human Rights, where it is contended that the environmental noise pollution destroys a person's effective enjoyment of right to respect for home and private life, a violation of Article 8 of the European Court of Human Rights Act. Furthermore, the paper considers the consequent devaluation of a dwelling as a measure of part of the damage that arises when wind turbines are sited too close to a dwelling, causing acoustic radiation and consequent adverse health responses.
The review concludes that a safe buffer zone of at least 2km should exist between family dwellings and industrial wind turbines of up to 2MW installed capacity, with greater separation for a wind turbine greater than 2MW installed capacity.
Also filed under [
Impact on People|
Noise]
UK Renewable Energy Data: Issue 1 (08.12.06): Vol. 5: Wind
December 8, 2006
by Oswald Consultancy Ltd for Renewable Energy Foundation
Editor's Note: The following are selected excerpts from the Renewable Energy Foundation press release describing this research. The full press release is available via the link below.
Using the new research it is now possible to assess how renewable generators up and down the country are performing. This data, published in five online files; Biomass, Hydro, Landfill Gas, Sewage Gas and Windpower, shows that firm generators are producing high load factors with carefully designed resource use and load following.
However in the wind sector, far and away the most active of all the technologies at present, results vary enormously due to location. The capacities offshore are encouraging, whilst those onshore are generally only superior in locations very distant from the populations requiring the electrical energy.
Although most sites were built on expected capacity factors of around 30%, results include;
19% (approx) capacity factor for the wind turbines at Dagenham, Essex.
9% (approx) capacity factor at the Barnard Castle plant, County Durham.
The best performing wind sites are in the north of Scotland, and on Shetland the wind turbines are producing capacity factors of over 50%.
Using this analysis of the Ofgem data, researchers have also calibrated a model predicting how a large installed capacity of wind power built across the UK would actually perform. The project used Meteorological Office data to model output for every hour of every January from 1994-2006.
The startling results show that, even when distributed UK wide, the output is still highly volatile.
The average January power variation over the last 12 years is 94% of installed capacity. It is an uncontrolled variation decided by the weather.
The average minimum output is only 3.7% or 0.9GW in a 25GW system.
Power swings of 70% in 30 hours are the norm in January.
The governments’ expectation is that three quarters of the 2010 renewables target, and the lion’s share of the ‘20% by 2020’ target will be made up of windpower.[2] However, the new research offers predictions which are in keeping with Danish and German empirical experience and demonstrate the need for a broader spread of investment in the renewable sector. <br.
The report was commissioned from Oswald Consultancy Limited and funded by donation from the green entrepreneur Vincent Tchenguiz.
Campbell Dunford, CEO of REF, said: “This important modelling exercise shows that even with best efforts a large wind carpet in the UK would have a low capacity credit, and be a real handful to manage. This isn’t the best way to encourage China and India to move towards the low-carbon economy. As a matter of urgency, for the planet’s sake, we need to bring forward a much broader range of low carbon generating technologies, including the full sweep of renewables. Wind has a place, but it must not be allowed to squeeze out other technologies that have more to offer.”
Using the new research it is now possible to assess how renewable generators up and down the country are performing. This data, published in five online files; Biomass, Hydro, Landfill Gas, Sewage Gas and Windpower, shows that firm generators are producing high load factors with carefully designed resource use and load following.
However in the wind sector, far and away the most active of all the technologies at present, results vary enormously due to location. The capacities offshore are encouraging, whilst those onshore are generally only superior in locations very distant from the populations requiring the electrical energy.
Although most sites were built on expected capacity factors of around 30%, results include;
19% (approx) capacity factor for the wind turbines at Dagenham, Essex.
9% (approx) capacity factor at the Barnard Castle plant, County Durham.
The best performing wind sites are in the north of Scotland, and on Shetland the wind turbines are producing capacity factors of over 50%.
Using this analysis of the Ofgem data, researchers have also calibrated a model predicting how a large installed capacity of wind power built across the UK would actually perform. The project used Meteorological Office data to model output for every hour of every January from 1994-2006.
The startling results show that, even when distributed UK wide, the output is still highly volatile.
The average January power variation over the last 12 years is 94% of installed capacity. It is an uncontrolled variation decided by the weather.
The average minimum output is only 3.7% or 0.9GW in a 25GW system.
Power swings of 70% in 30 hours are the norm in January.
The governments’ expectation is that three quarters of the 2010 renewables target, and the lion’s share of the ‘20% by 2020’ target will be made up of windpower.[2] However, the new research offers predictions which are in keeping with Danish and German empirical experience and demonstrate the need for a broader spread of investment in the renewable sector. <br.
The report was commissioned from Oswald Consultancy Limited and funded by donation from the green entrepreneur Vincent Tchenguiz.
Campbell Dunford, CEO of REF, said: “This important modelling exercise shows that even with best efforts a large wind carpet in the UK would have a low capacity credit, and be a real handful to manage. This isn’t the best way to encourage China and India to move towards the low-carbon economy. As a matter of urgency, for the planet’s sake, we need to bring forward a much broader range of low carbon generating technologies, including the full sweep of renewables. Wind has a place, but it must not be allowed to squeeze out other technologies that have more to offer.”
This is the report submitted by the Planning Inspector appointed by the National Assembly for Wales that dismisses the appeal by the Awe Amman Tawe quango for a wind farm on Mynydd-y-Gwrhyd.
Of particular interest are the Inspector's remarks on Landscape and Visual Impact (paragraphs 16-20 on pages 5-6) with respect to how 'developers photomontages' do not give the true visual impact of actual wind farm sites.
Of particular interest are the Inspector's remarks on Landscape and Visual Impact (paragraphs 16-20 on pages 5-6) with respect to how 'developers photomontages' do not give the true visual impact of actual wind farm sites.
Also filed under [
Impact on Landscape|
Zoning/Planning]
A guide to calculating the carbon dioxide debt and payback time for wind farms
July, 2006
by Dr M J Hall, FRSC, FIBiol for Renewable Energy Foundation
It is broadly accepted that wind turbines do not emit CO2 at the point of generation. However, in common with all types of power station, it is emitted during their construction and, through damage directly inflicted on the construction site, over a much longer period. The total debt will vary from site to site but will comprise some or all of the following;
• Emissions arising from fabrication (steel smelting, forging of turbine columns, the manufacture of blades and the electrical and mechanical components);
• Emissions arising from construction (transportation of components, quarrying, building foundations, access tracks and hard standings, commissioning);
• The indirect loss of CO2 uptake (fixation) by plants originally on the surface of the site but obliterated by construction activity including the destruction of active bog plants on wet sites and deforestation;
• Emissions due to the indirect, long-term liberation of CO2 from carbon stored in peat due to drying and oxidation processes caused by construction of the site.
It is important to recognise that peat is a major store of carbon accumulated from dead plant remains over many millennia. It is held in perpetuity because the bog’s wetness and acid conditions prevent the access of oxygen and inhibit the growth of bacteria which would otherwise rot the vegetation. Draining peat for construction reverses both these long-term processes: the soil is exposed to the air, the carbon is converted to CO2 and released slowly to the atmosphere.
Several papers from the wind industry in Denmark and the UK have addressed the first two points with estimates of payback time ranging from about six to 30 months.
However, the industry rarely, if ever, considers the last two. This is a fundamental omission as their contribution to the overall CO2 debt, in particular the last, can be far greater than all the others put together. This paper outlines a procedure for quantifying it.
The guide has been prepared to enable anyone with access to the Environmental Statement (ES) that forms part of a Planning Application (PA) for a wind farm to estimate its CO2 debt. (If some of the requisite information proves to be unavailable, this ought to provide grounds for postponing consideration of the application and the commissioning of further assessment.)
The results of the calculations described should be submitted to planning authorities or Public Inquiries as part of the arguments used in assessing the merits and demerits of an application.
• Emissions arising from fabrication (steel smelting, forging of turbine columns, the manufacture of blades and the electrical and mechanical components);
• Emissions arising from construction (transportation of components, quarrying, building foundations, access tracks and hard standings, commissioning);
• The indirect loss of CO2 uptake (fixation) by plants originally on the surface of the site but obliterated by construction activity including the destruction of active bog plants on wet sites and deforestation;
• Emissions due to the indirect, long-term liberation of CO2 from carbon stored in peat due to drying and oxidation processes caused by construction of the site.
It is important to recognise that peat is a major store of carbon accumulated from dead plant remains over many millennia. It is held in perpetuity because the bog’s wetness and acid conditions prevent the access of oxygen and inhibit the growth of bacteria which would otherwise rot the vegetation. Draining peat for construction reverses both these long-term processes: the soil is exposed to the air, the carbon is converted to CO2 and released slowly to the atmosphere.
Several papers from the wind industry in Denmark and the UK have addressed the first two points with estimates of payback time ranging from about six to 30 months.
However, the industry rarely, if ever, considers the last two. This is a fundamental omission as their contribution to the overall CO2 debt, in particular the last, can be far greater than all the others put together. This paper outlines a procedure for quantifying it.
The guide has been prepared to enable anyone with access to the Environmental Statement (ES) that forms part of a Planning Application (PA) for a wind farm to estimate its CO2 debt. (If some of the requisite information proves to be unavailable, this ought to provide grounds for postponing consideration of the application and the commissioning of further assessment.)
The results of the calculations described should be submitted to planning authorities or Public Inquiries as part of the arguments used in assessing the merits and demerits of an application.
Also filed under [
Pollution|
Energy Policy]
Location, Location, Location- An investigation into wind farms and noise by The Noise Association
June, 2006
by John Stewart, UK Noise Association
Noise - ‘unwanted sound’ – can ruin people’s well-being and environment
“Peace and quiet is the single most important factor people have in mind when buying a home – with one in five prospective homebuyers rating it as the most important consideration when choosing where they will buy.” Alliance and Leicester Survey, 3/6/02
The Noise Association, which published this report, is the research arm of the UK Noise Association. Both organisations are based at 2nd Floor, Broken Wharf House, 2 Broken Wharf, London EC4V 3DT, tel 020 7329 0774, email info@ukna.org.uk www.ukna.org.uk
Editor's Note: The complete report is available in the attached pdf file 'Noise Association'. A smaller, edited version that excludes two pages of photos (pages 7 & 11) is also available. Selected Extracts from this report appear below.
“Peace and quiet is the single most important factor people have in mind when buying a home – with one in five prospective homebuyers rating it as the most important consideration when choosing where they will buy.” Alliance and Leicester Survey, 3/6/02
The Noise Association, which published this report, is the research arm of the UK Noise Association. Both organisations are based at 2nd Floor, Broken Wharf House, 2 Broken Wharf, London EC4V 3DT, tel 020 7329 0774, email info@ukna.org.uk www.ukna.org.uk
Editor's Note: The complete report is available in the attached pdf file 'Noise Association'. A smaller, edited version that excludes two pages of photos (pages 7 & 11) is also available. Selected Extracts from this report appear below.