Wilderness Society and Center for Biological Diversity comment on Deerfield Wind DEIS
November 27, 2008
by Mary C. Krueger and Mollie Matteson
On October 19, the town of Wallagrass, ME passed a 6-month moratorium on wind energy development to become effective October 16, 2008. The wording of the ordinance can be accessed by clicking on the link below.
Also filed under [
Zoning/Planning|
Maine]
For two decades, the capacity factor of wind power measuring the mean energy delivered by wind turbines has been assumed at 35% of the name plate capacity. Yet, the mean realized value for Europe over the last five years is closer to 21% thus making levelized cost 66% higher than previously thought. We document this discrepancy and offer rationalizations, emphasizing the long term variations of wind speeds. We conclude with the consequences of the capacity factor miscalculation and some policy recommendations. Click on the link below to download the full document.
This motion was filed with the Vermont Public Service Board on Sep 22, the day hearings were to begin for the Deerfield Wind LLC proposal. Deerfield Wind LLC is seeking to erect 15 industrial scale wind turbines in the Green Mountain National Forest. In response, the Vermont Public Service Board ordered that the hearings be rescheduled to December 1, 2008.
The Deerfield Wind Energy facility is the first wind plant to be proposed for US National Forest lands. The Draft Environmental Impact Statement released by the US Forest Service can be accessed by clicking on the link(s) below. Comments will be accepted through until the end of November 2008.
The Vermont Public Service Board has issued an order regarding violation of a 2003 Certificate of Public Good issued to enXco authorizing construction of two wind measurement towers ("met towers") on Lowell Mountain. The CPG required that the towers be removed within five years of the date of the CPG. The order detailing the violation and subsequent agreements is listed below.
The Logan County, IL zoning board of adjustment is conducting a public hearing on Horizon Wind's Rail Splitter wind facility. Mr. Len Freeman of Emden, IL presented this testimony before the Board. An excerpt of Mr. Freeman's testimony can be read below. His full testimony can be accessed by clicking on the link below.
Memo from the Massachusetts Department of Public Utilities Chairman, Paul Hibbard, to the ISO New England. Chairman Hibbard expresses his concerns over the push to regionalize costs for building expensive transmission lines to service renewable projects (wind) built far from load centers. Current FERC rules are unclear on how to justify distribution of the costs across all ratepayers within the region unless it can be shown such transmission is needed to ensure the reliability and integrity of the grid.
Also filed under [
Energy Policy|
Connecticut|
Massachusetts|
Maine|
New Hampshire|
Rhode Island|
Vermont]
Union Ridge residents statement to the Logan County Planning Commission
June 4, 2008
by Glen Fogler et. al.
The below statement was filed with the Logan County Planning Commission in regard to the Rail Splitter wind energy facility proposed for Logan County, IL.
Concerned Citizens to Save Roxbury have petitioned the Roxbury, ME selectboard to hold a special meeting to determine whether the voters would support a 180-day moratorium on wind energy development. The petition filed with the selectboard and other related documents are detailed below. All documents can be accessed in full by clicking on the below links.