....Wind is primarily an energy resource that makes relatively little contribution to meeting system peak loads. Even with large amounts of wind, the Northwest will still need to build other generating resources to meet growing peak load requirements.......But wind energy cannot provide reliable electric service on its own.
When wind energy is added to a utility system, its natural variability and uncertainty is combined with the natural variability and uncertainty of loads. This increases the need for flexible resources such as hydro, gas-fired power plants, or dispatchable loads to maintain utility system balance and reliability across several different timescales. The demand for this flexibility increases with the amount of wind in the system.
A. The brief answer is no. When Zilkha Renewable Energy applied to EFSEC for permits in January 2003 they made no attempt at that time to apply to Kittitas County in a timely manner in order to resolve non-compliance issues. It took the applicant five months to complete a short application. The (initial) applications to the County were not complete. They had major flaws like the application not being signed, not providing a list of property owners within 300' of the project site, not providing the signatures of the landowners within the project area, and stating that they were only applying for certain permits from the County but not those required (to achieve compliance). The major flaws within each submittal were the most basic elements of the application and listed on the front page of the application. In all the years I have been a Land Use Planner I have never had an applicant provide an application with so many fundamental flaws so many times. I cannot help but think that this was a strategy of Zilkha's all along. This issue was even brought up to the applicant when they continually delayed submitting a complete application to the County. When a complete application was finally received I sent out the Notice of Application within one week. This was the first and only action that the County had control over and it was completed in a timely manner. Zilkha Renewable Energy knew that we were relying on the DEIS to be published which is why we could not give them a conclusive date when the County would hold hearings. On numerous occasions between June and October 2003 we let Zilkha know how much time it would take the County to process their application once an adequate DEIS was complete and the process was in our hands. When the DEIS completion date was pushed back so was our timeframe.
Affected Environment, Environmental Impacts and Mitigation Measures
"A number of comments submitted for the scoping process for the Desert Claim project EIS addressed concerns relating to potential health and safety issues. Specific topics indicated in these comments included certain possible hazards that are uniquely associated with wind turbines, such as blade throw and ice throw; health and safety issues associated with electrical and magnetic fields; more common hazards such as fire; and the incidence and impacts of shadow flicker, another phenomenon specific to wind turbines. Section 3.8 addresses these wide-ranging health and safety topics that have been identified as concerns for the environmental review. "