Wilderness Society and Center for Biological Diversity comment on Deerfield Wind DEIS
November 27, 2008
by Mary C. Krueger and Mollie Matteson
This document provides before and after aerial photos of the very southern end of the NedPower wind facility, the most recently constructed wind energy facility in the mid-Atlantic region. The project is comprised of 132 2-MW Gamesa wind turbines, each nearly 400 feet tall. Extensive clearing of forest was done to install the turbines and other project infrastructure. The average width of the area bulldozed for road corridor varies from about 75 to 100 feet.
This motion was filed with the Vermont Public Service Board on Sep 22, the day hearings were to begin for the Deerfield Wind LLC proposal. Deerfield Wind LLC is seeking to erect 15 industrial scale wind turbines in the Green Mountain National Forest. In response, the Vermont Public Service Board ordered that the hearings be rescheduled to December 1, 2008.
The Deerfield Wind Energy facility is the first wind plant to be proposed for US National Forest lands. The Draft Environmental Impact Statement released by the US Forest Service can be accessed by clicking on the link(s) below. Comments will be accepted through until the end of November 2008.
The Vermont Public Service Board has issued an order regarding violation of a 2003 Certificate of Public Good issued to enXco authorizing construction of two wind measurement towers ("met towers") on Lowell Mountain. The CPG required that the towers be removed within five years of the date of the CPG. The order detailing the violation and subsequent agreements is listed below.
Memo from the Massachusetts Department of Public Utilities Chairman, Paul Hibbard, to the ISO New England. Chairman Hibbard expresses his concerns over the push to regionalize costs for building expensive transmission lines to service renewable projects (wind) built far from load centers. Current FERC rules are unclear on how to justify distribution of the costs across all ratepayers within the region unless it can be shown such transmission is needed to ensure the reliability and integrity of the grid.
Also filed under [
Energy Policy|
Connecticut|
Massachusetts|
Maine|
New Hampshire|
Rhode Island|
Vermont]
This document includes discovery questions and responses between Windaction.org and Deerfield Wind.
The Vermont Legislature has now passed S.209 with amendments objected to by Northeast Kingdom Senators Coppenrath, Kitchel, and Starr and by several other senators with industrial wind energy proposals in their districts. As Sen. Coppenrath noted in consideration of an amendment to S. 209, recorded in the Feb. 26, 2008 Journal of the Senate, "I vote No because, although there are many very good provisions in this bill, I believe that Section 25 clearly allows the destruction of our mountain tops and ridgelines while providing subsidies for wind developers at the expense of the Vermont resident property tax payers."
Also filed under [
Energy Policy|
Vermont]
Ridge Protectors Appeal of the VT PSB decision on UPC/Sheffield Wind LLC
January 28, 2008
by C. Daniel Hershenson Esq. and Anthony Z. Roisman Esq.
This Appellent's brief was filed with the Vermont Supreme Court in response to the Vermont Public Service Board's decision to grant a certificate of public good to UPC Wind's Sheffield Wind energy project.
On December 12, 2007, a special town meeting was held in Wilmington VT to determine the position the Selectboard should take on the Searsburg expansion project, also known as Deerfield Wind. The vote counts inserted below have been verified with the Wilmington Town Clerk.