Eric Rosenbloom, a resident of Vermont's Northeast Kingdom, addresses why wind power does not live up to advocates' claims, why its impact on the environment and people's lives is far from benign and how money invested in wind energy could be better spent.
Also filed under [
Impact on People|
Energy Policy]
Adam Kelly: Direct Testimony to Vermont Public Service Board on behalf of Vermont Agency of Natural Resources
December 22, 2004
by Adam Kelly
...additional radar studies would be required to see if spring migration patterns are different than those measured in the fall. Typically spring migration is shorter than fall migration with fewer numbers in the shorter period of time. How this will affect the numbers of birds passing through the rotor swept volume is unknown. It is important to determine the seasonal timing, altitude and numbers of migrant birds passing over the proposed project site and the effects of weather upon their passage over a greater part of the whole year. In addition, it is possible to determine some of the bird and bat species passing through the project site by accoustical sensors to determine which species, that make vocal calls, are migrating through the site.
Army Corps letter to Sheffield Wind regarding individual wetlands permit application
August 23, 2007
by Curtis L. Thalken
Army Corps' letter to UPC Wind states that the Sheffield Wind project "is not eligible for authorization under the VT General Permit, and must be reviewed under the individual permit review procedure." The letter further states that UPC Wind "may not proceed with any proposed work within our jurisdiction until you have received written authorization from this office." The full letter can be accessed by clicking on the link below.
Also filed under [
Impact on Wildlife|
Impact on Landscape]
This document includes discovery questions and responses between Windaction.org and Deerfield Wind.
...the MEA Report can be used to estimate the value (avoided emissions) of Renewable Energy Certificates (REC) by providing both REC suppliers and stakeholders with information that can be used to communicate the environmental benefits of RECs and works to enhance the overall REC marketplace.
Editor's Note: As noted below under Methodology [emphasis added], this report appears to substantiate the point that wind energy would not backdown "baseload" generation.
Editor's Note: As noted below under Methodology [emphasis added], this report appears to substantiate the point that wind energy would not backdown "baseload" generation.
Also filed under [
Pollution|
Tax Breaks & Subsidies|
Energy Policy|
Connecticut|
Massachusetts|
Maine|
New Hampshire|
Rhode Island]
The Deerfield Wind Energy facility is the first wind plant to be proposed for US National Forest lands. The Draft Environmental Impact Statement released by the US Forest Service can be accessed by clicking on the link(s) below. Comments will be accepted through until the end of November 2008.
Also filed under [
USA]
Draft: Update To the 2005 Vermont Electric Plan
October 20, 2006
by Vermont Department of Public Service
The Update to the 2005 electric plan frames issues within the statutory directive provided by the legislature in 30 V.S.A. §202, which requires that the electric plan ensure,
. . . to the greatest extent practicable, that Vermont can meet its energy service needs in a manner that is adequate, reliable, secure, and sustainable; that assures affordability and encourages the state’s economic vitality, the efficient use of energy resources and cost effective demand side management; and that is environmentally sound.
Also filed under [
Energy Policy]
This motion was filed with the Vermont Public Service Board on Sep 22, the day hearings were to begin for the Deerfield Wind LLC proposal. Deerfield Wind LLC is seeking to erect 15 industrial scale wind turbines in the Green Mountain National Forest. In response, the Vermont Public Service Board ordered that the hearings be rescheduled to December 1, 2008.
Final Report: Vermont Electric Energy Efficiency Potential Study
May 10, 2006
by GDS Associates Inc for the Vermont Department of Public Service
This technical report was prepared for the Vermont Department of Public Service (VDPS) by GDS Associates, Inc and the American Council for an Energy Efficient Economy.
Editor's Note: The complete report and accompanying power point presentation are available below.
Editor's Note: The complete report and accompanying power point presentation are available below.
Also filed under [
Energy Policy]
Contact informtion for Governor Douglas, the Vermont Public Service Board as well as state representatives and senators for the communities affected by the proposed wind plant on Glebe Mountain, Londonderry, Vermont.
Also filed under [