CTA summary of findings on preconstruction noise studies, Clayton Wind Farm Project
August 24, 2008
by Gregory C. Tocci and William J. Elliot
Summary:
Cavanaugh Tocci Associates (CTA) was hired by the Town of Clayton NY to review the noise analysis prepared by Iberdrola/PPM for the Clayton wind farm project. CTA's report was delivered to the town on February 15, 2008 but refused by the Town Board with objections that the report was too technical. CTA was asked to prepare an executive summary of their report. The executive summary of the report can be accessed by clicking on the link below. To date, the town has refused to release the full CTA report to the residents of Clayton or to the Planning Board.