    <rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:admin="http://webns.net/mvcb/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom">
     <channel>
        <title>www.windaction.org |  facts, analysis, exposure of wind energy's real impacts</title>
        <link>http://www.windaction.org/</link>
        <atom:link href="http://www.windaction.org/articles/c99+48?theme=rss" rel="self" type="application/rss+xml" />
        <description>facts, analysis, exposure of wind energy's real impacts</description>
        <dc:language>en-us</dc:language> 
        <dc:creator>Windaction</dc:creator> 
        <admin:generatorAgent rdf:resource="http://www.xaraya.org" /> 
        <admin:errorReportsTo rdf:resource="mailto:admin@windaction.org" /> 
       <sy:updatePeriod>hourly</sy:updatePeriod> 
       <sy:updateFrequency>1</sy:updateFrequency> 
       <docs>http://backend.userland.com/rss</docs>
            <item>
<title>Fallen met tower in Somerset County PA</title>
<link>http://www.windaction.org/articles/13218</link>
<pubDate>Sat, 15 Dec 2007 15:11:23 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ This photo was taken in Somerset County at around 4pm on Dec. 15, 2007.   

 ]]></content:encoded>
<description>This photo was taken in Somerset County at around 4pm on Dec. 15, 2007.   

</description>
<guid isPermaLink="true">http://www.windaction.org/articles/13218</guid>
</item>
            <item>
<title>Locust Ridge wind turbine fire still under investigation</title>
<link>http://www.windaction.org/articles/21321</link>
<pubDate>Fri, 22 May 2009 10:06:58 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ The May 14 fire at the skyscraper-size Turbine 12 at the Locust Ridge I commercial wind farm in Mahanoy Township occurred during routine maintenance, according to a company official.

Jan Johnson, corporate communications director for Iberdrola Renewables in Portland, Ore., which owns the wind farm, said Thursday that Turbine 12 is still shut down. When asked how the fire started, she said, &quot;We're still investigating.&quot;

 ]]></content:encoded>
<description>The May 14 fire at the skyscraper-size Turbine 12 at the Locust Ridge I commercial wind farm in Mahanoy Township occurred during routine maintenance, according to a company official.

Jan Johnson, corporate communications director for Iberdrola Renewables in Portland, Ore., which owns the wind farm, said Thursday that Turbine 12 is still shut down. When asked how the fire started, she said, &quot;We're still investigating.&quot;

</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21321</guid>
</item>
            <item>
<title>Report of wind turbine fire draws crews</title>
<link>http://www.windaction.org/articles/21220</link>
<pubDate>Fri, 15 May 2009 18:17:23 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Firefighters responded to a report of a wind turbine fire at the first commercial-size wind farm in Schuylkill County, Locust Ridge I in Mahanoy Township, Thursday afternoon, according to reports from the Schuylkill County Communications Center.
 ]]></content:encoded>
<description>Firefighters responded to a report of a wind turbine fire at the first commercial-size wind farm in Schuylkill County, Locust Ridge I in Mahanoy Township, Thursday afternoon, according to reports from the Schuylkill County Communications Center.
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21220</guid>
</item>
            <item>
<title>Firefighters respond to wind turbine fire in Mahanoy Township</title>
<link>http://www.windaction.org/articles/21211</link>
<pubDate>Thu, 14 May 2009 03:51:14 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Firefighters responded to a report of a turbine fire at the first commercial-size wind farm in Schuylkill County, Locust Ridge I in Mahanoy Township, Thursday afternoon, according to reports from Schuylkill County Communications. ...In service since March 2007, this G87 turbine is one of the original 13 turbines which was part of the Locust Ridge I. ]]></content:encoded>
<description>Firefighters responded to a report of a turbine fire at the first commercial-size wind farm in Schuylkill County, Locust Ridge I in Mahanoy Township, Thursday afternoon, according to reports from Schuylkill County Communications. ...In service since March 2007, this G87 turbine is one of the original 13 turbines which was part of the Locust Ridge I.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21211</guid>
</item>
            <item>
<title>Wind Turbine Break ‘Isolated Occurence'</title>
<link>http://www.windaction.org/articles/13050</link>
<pubDate>Thu, 06 Dec 2007 17:42:53 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ No word yet on what caused a blade to break apart on a wind turbine at the Waymart Wind Farm, Monday afternoon.

Two blades on the three-bladed rotor remained intact, but one delaminated, meaning its fiberglass layers came apart. &quot;This is on private property. No one was injured,&quot; says Steve Stengel, a spokesperson for FPL Energy which owns the wind farm. ...A total of 43 wind turbines line the Moosic Mountain Ridge. The 1.5 megawatt Waymart Wind Farm was completed in 2003. 

 ]]></content:encoded>
<description>No word yet on what caused a blade to break apart on a wind turbine at the Waymart Wind Farm, Monday afternoon.

Two blades on the three-bladed rotor remained intact, but one delaminated, meaning its fiberglass layers came apart. &quot;This is on private property. No one was injured,&quot; says Steve Stengel, a spokesperson for FPL Energy which owns the wind farm. ...A total of 43 wind turbines line the Moosic Mountain Ridge. The 1.5 megawatt Waymart Wind Farm was completed in 2003. 

</description>
<guid isPermaLink="true">http://www.windaction.org/articles/13050</guid>
</item>
            <item>
<title>Gamesa pinpoints turbine-blade flaw</title>
<link>http://www.windaction.org/articles/9514</link>
<pubDate>Fri, 11 May 2007 11:43:13 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Gamesa Inc. on Friday identified a defect in an applicator used to apply a thin Fiberglas layer to wind-turbine blades as the cause of blade splintering and breakage.

The blades are manufactured at Gamesa's Ebensburg-area factory.  ]]></content:encoded>
<description>Gamesa Inc. on Friday identified a defect in an applicator used to apply a thin Fiberglas layer to wind-turbine blades as the cause of blade splintering and breakage.

The blades are manufactured at Gamesa's Ebensburg-area factory. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/9514</guid>
</item>
            <item>
<title>Bad gluing blamed for mishaps at wind farm</title>
<link>http://www.windaction.org/articles/9393</link>
<pubDate>Mon, 07 May 2007 11:27:02 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ It all came down to glue. And how it was misapplied by workers.

Spanish wind-energy company Gamesa said &quot;insufficient and irregular distribution of glue&quot; caused large pieces to break off seven turbine blades at the Allegheny Ridge Wind Farm near Lilly, Cambria County. No one was injured during the mishap in mid-March, but pieces of the blades flew more than 500 feet, according to residents.  ]]></content:encoded>
<description>It all came down to glue. And how it was misapplied by workers.

Spanish wind-energy company Gamesa said &quot;insufficient and irregular distribution of glue&quot; caused large pieces to break off seven turbine blades at the Allegheny Ridge Wind Farm near Lilly, Cambria County. No one was injured during the mishap in mid-March, but pieces of the blades flew more than 500 feet, according to residents. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/9393</guid>
</item>
            <item>
<title>Wind farm at a standstill</title>
<link>http://www.windaction.org/articles/9156</link>
<pubDate>Wed, 25 Apr 2007 11:41:36 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Whatever is causing turbine blades made at Gamesa Energy USA near Ebensburg to splinter should be known within weeks, a company representative said Wednesday.

Meanwhile, the startup of the Allegheny Ridge Wind Farm - which will become Pennsylvania's largest wind farm - will be on hold until the blade investigation is completed, Ellen Lutz, director of development for Gamesa's Atlantic Region, said Wednesday.  ]]></content:encoded>
<description>Whatever is causing turbine blades made at Gamesa Energy USA near Ebensburg to splinter should be known within weeks, a company representative said Wednesday.

Meanwhile, the startup of the Allegheny Ridge Wind Farm - which will become Pennsylvania's largest wind farm - will be on hold until the blade investigation is completed, Ellen Lutz, director of development for Gamesa's Atlantic Region, said Wednesday. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/9156</guid>
</item>
            <item>
<title>Problems at wind farm could derail acquisition</title>
<link>http://www.windaction.org/articles/8818</link>
<pubDate>Thu, 05 Apr 2007 11:59:23 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ An Australian company that wants to buy a Cambria County wind farm might walk away if it's not determined what caused seven turbine blades to crack and large pieces of two blades to fly off.

The problems at the Allegheny Ridge wind farm are a serious concern, said Neal Emmerton, regional asset manager for Sydney-based Babcock &amp; Brown. Gamesa, the Spanish firm that developed the facility, has been paid, but the deal won't be final until the blade issues are resolved, he said.  ]]></content:encoded>
<description>An Australian company that wants to buy a Cambria County wind farm might walk away if it's not determined what caused seven turbine blades to crack and large pieces of two blades to fly off.

The problems at the Allegheny Ridge wind farm are a serious concern, said Neal Emmerton, regional asset manager for Sydney-based Babcock &amp; Brown. Gamesa, the Spanish firm that developed the facility, has been paid, but the deal won't be final until the blade issues are resolved, he said. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/8818</guid>
</item>
            <item>
<title>Trade association: ‘blade problems are rare’</title>
<link>http://www.windaction.org/articles/8589</link>
<pubDate>Sat, 24 Mar 2007 11:41:28 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Wind-energy experts say incidents such as the splintering of two blades and cracks in five others produced at Gamesa's Cambria Township factory are rare.

The American Wind Energy Association views the problem as a fluke, an anomaly that turned up in a time-proven industry involving a highly respected company.

&quot;We haven't heard of anything like this before. There have been thousands of blades installed, and this is a first,&quot; said Christine Real-de-Azua, spokeswoman for the wind energy national trade association, based in Washington, D.C.

&quot;Offhand, this doesn't seem like a big issue. We haven't heard of any other problems.&quot;  ]]></content:encoded>
<description>Wind-energy experts say incidents such as the splintering of two blades and cracks in five others produced at Gamesa's Cambria Township factory are rare.

The American Wind Energy Association views the problem as a fluke, an anomaly that turned up in a time-proven industry involving a highly respected company.

&quot;We haven't heard of anything like this before. There have been thousands of blades installed, and this is a first,&quot; said Christine Real-de-Azua, spokeswoman for the wind energy national trade association, based in Washington, D.C.

&quot;Offhand, this doesn't seem like a big issue. We haven't heard of any other problems.&quot; </description>
<guid isPermaLink="true">http://www.windaction.org/articles/8589</guid>
</item>
            <item>
<title>Turbine blades broken: Manufacturer Gamesa Corp. says wind farm plans on hold until solution is determined</title>
<link>http://www.windaction.org/articles/8547</link>
<pubDate>Thu, 22 Mar 2007 12:07:34 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ The Allegheny Ridge Wind Farm's phase one startup has been put on hold because some of Gamesa's locally made blades are chipping apart.

Gamesa officials, who met with Portage and Washington township officials Wednesday for the go-ahead on a second phase, said they found issues with seven blades after realizing two of them splintered on the towers.

They had hoped to have the first phase online by the end of the month.

&quot;The structure of the blade was intact in most places ... it somehow split open and fell,&quot; said Alberto Gros Isla, the plant's manager.

It wasn't the blades that fell; rather, it was a &quot;thin fiberglass skin&quot; that coated them, he said.

One piece stretched the length of the 147-foot-blade, and another was at least 20 feet long, Gros Isla said.  ]]></content:encoded>
<description>The Allegheny Ridge Wind Farm's phase one startup has been put on hold because some of Gamesa's locally made blades are chipping apart.

Gamesa officials, who met with Portage and Washington township officials Wednesday for the go-ahead on a second phase, said they found issues with seven blades after realizing two of them splintered on the towers.

They had hoped to have the first phase online by the end of the month.

&quot;The structure of the blade was intact in most places ... it somehow split open and fell,&quot; said Alberto Gros Isla, the plant's manager.

It wasn't the blades that fell; rather, it was a &quot;thin fiberglass skin&quot; that coated them, he said.

One piece stretched the length of the 147-foot-blade, and another was at least 20 feet long, Gros Isla said. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/8547</guid>
</item>
            <item>
<title>Wind Turbine Blade Safety Questioned After Damages</title>
<link>http://www.windaction.org/articles/9264</link>
<pubDate>Thu, 22 Mar 2007 12:02:41 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[  ]]></content:encoded>
<description></description>
<guid isPermaLink="true">http://www.windaction.org/articles/9264</guid>
</item>
            <item>
<title>Turbine blade shredded in PA</title>
<link>http://www.windaction.org/articles/13022</link>
<pubDate>Tue, 04 Dec 2007 23:45:49 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ <p>
A blade on one of the turbines at the Waymart wind farm in Wayne County, PA shredded in high wind conditions. The 43 wind turbines along the Moosic Mountain Ridge went online in 2003. 
</p>
<p>
 Duration: 16 seconds 
</p>
 ]]></content:encoded>
<description>
A blade on one of the turbines at the Waymart wind farm in Wayne County, PA shredded in high wind conditions. The 43 wind turbines along the Moosic Mountain Ridge went online in 2003. 


 Duration: 16 seconds 

</description>
<guid isPermaLink="true">http://www.windaction.org/articles/13022</guid>
</item>
   </channel>
</rss>
