    <rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:admin="http://webns.net/mvcb/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom">
     <channel>
        <title>www.windaction.org |  facts, analysis, exposure of wind energy's real impacts</title>
        <link>http://www.windaction.org/</link>
        <atom:link href="http://www.windaction.org/articles/c45+132?theme=rss" rel="self" type="application/rss+xml" />
        <description>facts, analysis, exposure of wind energy's real impacts</description>
        <dc:language>en-us</dc:language> 
        <dc:creator>Windaction</dc:creator> 
        <admin:generatorAgent rdf:resource="http://www.xaraya.org" /> 
        <admin:errorReportsTo rdf:resource="mailto:admin@windaction.org" /> 
       <sy:updatePeriod>hourly</sy:updatePeriod> 
       <sy:updateFrequency>1</sy:updateFrequency> 
       <docs>http://backend.userland.com/rss</docs>
            <item>
<title>Wind farm put on hold</title>
<link>http://www.windaction.org/articles/37382</link>
<pubDate>Thu, 14 Feb 2013 18:13:28 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ An application for occupancy of right of way in Custer County for transmission lines for a proposed wind farm has been put on hold while the project looks to work further with neighbors to limit inconveniences to them. ...neighbors in the area of the project complained at a previous meeting of the commission, saying they didn't approve of all the construction, noise and view obstructions that would be a result of the project. ]]></content:encoded>
<description>An application for occupancy of right of way in Custer County for transmission lines for a proposed wind farm has been put on hold while the project looks to work further with neighbors to limit inconveniences to them. ...neighbors in the area of the project complained at a previous meeting of the commission, saying they didn't approve of all the construction, noise and view obstructions that would be a result of the project.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/37382</guid>
</item>
            <item>
<title>Landowners concerned about power lines near wind project</title>
<link>http://www.windaction.org/articles/31705</link>
<pubDate>Thu, 14 Apr 2011 16:29:34 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ A proposal for 20 turbines on Lowell Mountain has stirred controversy in the Northeast Kingdom. But there's another piece of the project that hasn't received as much attention. Utilities want to build a new, 15-mile power line to get the wind power out to the grid. 
 ]]></content:encoded>
<description>A proposal for 20 turbines on Lowell Mountain has stirred controversy in the Northeast Kingdom. But there's another piece of the project that hasn't received as much attention. Utilities want to build a new, 15-mile power line to get the wind power out to the grid. 
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/31705</guid>
</item>
            <item>
<title>Tehachapi renewable energy project challenged by LA County supervisors</title>
<link>http://www.windaction.org/articles/24757</link>
<pubDate>Tue, 22 Dec 2009 01:38:30 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ A $1.7 billion Southern California Edison renewable energy project under construction in three counties met with a legal challenge today from the Los Angeles County Board of Supervisors.

The project is intended to create 250 miles of new and upgraded electrical transmission facilities and substations. The project will transmit electrical power from wind farms in Tehachapi. ]]></content:encoded>
<description>A $1.7 billion Southern California Edison renewable energy project under construction in three counties met with a legal challenge today from the Los Angeles County Board of Supervisors.

The project is intended to create 250 miles of new and upgraded electrical transmission facilities and substations. The project will transmit electrical power from wind farms in Tehachapi.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/24757</guid>
</item>
            <item>
<title>The Northern Pass | 'My roots are deeper than your pockets'</title>
<link>http://www.windaction.org/articles/37780</link>
<pubDate>Fri, 01 Mar 2013 00:00:00 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Strangers' money has drawn a line across the land, sowing discord. It has divided the Placey family. They no longer talk to those who sold out. &quot;We pleaded with them; we asked them not to sell,&quot; Lynne says. But they wouldn't listen; they wanted the money. Her sister-in-law is distraught. She was close to her nieces; she can't believe that they would do this.

This division is repeated all over town, straining the North Country ethic of looking out for your neighbor. ]]></content:encoded>
<description>Strangers' money has drawn a line across the land, sowing discord. It has divided the Placey family. They no longer talk to those who sold out. &quot;We pleaded with them; we asked them not to sell,&quot; Lynne says. But they wouldn't listen; they wanted the money. Her sister-in-law is distraught. She was close to her nieces; she can't believe that they would do this.

This division is repeated all over town, straining the North Country ethic of looking out for your neighbor.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/37780</guid>
</item>
            <item>
<title>The people our governor wants to &quot;crush&quot;</title>
<link>http://www.windaction.org/articles/35643</link>
<pubDate>Fri, 27 Jul 2012 18:25:17 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Standing on a former mountaintop blasted away to build the new Suncrest Substation, Governor Jerry Brown yesterday praised completion of the 117-mile Sunrise Powerlink high voltage lines-and denigrated 79,000 citizens who have fought against destroying our communities and scenic vistas.
 
&quot;You have to crush the opposition,&quot; the Governor said forcefully. ]]></content:encoded>
<description>Standing on a former mountaintop blasted away to build the new Suncrest Substation, Governor Jerry Brown yesterday praised completion of the 117-mile Sunrise Powerlink high voltage lines-and denigrated 79,000 citizens who have fought against destroying our communities and scenic vistas.
 
&quot;You have to crush the opposition,&quot; the Governor said forcefully.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/35643</guid>
</item>
            <item>
<title>Tragedy of Tehachapi transmission project</title>
<link>http://www.windaction.org/articles/24006</link>
<pubDate>Sun, 08 Nov 2009 17:26:17 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ In 2007, SCE proposed its $1.72 billion dollar Tehachapi Renewable Transmission Project (TRTP) to bring renewable wind energy to Southern California. A small portion of the project passes through the community of Chino Hills. This is the only community along the 173 mile route where SCE proposes to construct 200-foot high, 60-foot wide poles within 75 feet of homes. SCE has never done this before. Nor has any utility in the country ever installed a 500,000 volt transmission line so close to existing homes. Over 1,000 homes will be within 500 feet of the line, along with daycares, places of worship and parks.  ]]></content:encoded>
<description>In 2007, SCE proposed its $1.72 billion dollar Tehachapi Renewable Transmission Project (TRTP) to bring renewable wind energy to Southern California. A small portion of the project passes through the community of Chino Hills. This is the only community along the 173 mile route where SCE proposes to construct 200-foot high, 60-foot wide poles within 75 feet of homes. SCE has never done this before. Nor has any utility in the country ever installed a 500,000 volt transmission line so close to existing homes. Over 1,000 homes will be within 500 feet of the line, along with daycares, places of worship and parks. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/24006</guid>
</item>
   </channel>
</rss>
