    <rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:admin="http://webns.net/mvcb/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom">
     <channel>
        <title>www.windaction.org |  facts, analysis, exposure of wind energy's real impacts</title>
        <link>http://www.windaction.org/</link>
        <atom:link href="http://www.windaction.org/articles/c112+77?theme=rss" rel="self" type="application/rss+xml" />
        <description>facts, analysis, exposure of wind energy's real impacts</description>
        <dc:language>en-us</dc:language> 
        <dc:creator>Windaction</dc:creator> 
        <admin:generatorAgent rdf:resource="http://www.xaraya.org" /> 
        <admin:errorReportsTo rdf:resource="mailto:admin@windaction.org" /> 
       <sy:updatePeriod>hourly</sy:updatePeriod> 
       <sy:updateFrequency>1</sy:updateFrequency> 
       <docs>http://backend.userland.com/rss</docs>
            <item>
<title>Spearville (KS)</title>
<link>http://www.windaction.org/articles/5825</link>
<pubDate>Wed, 18 Oct 2006 12:37:18 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Courtesy photo A view from the air of the completed Spearville wind farm and its 67 turbines includes Main Street and St. John the Baptist Catholic Church in the foreground. ]]></content:encoded>
<description>Courtesy photo A view from the air of the completed Spearville wind farm and its 67 turbines includes Main Street and St. John the Baptist Catholic Church in the foreground.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/5825</guid>
</item>
            <item>
<title>Blairsburg (IW)</title>
<link>http://www.windaction.org/articles/4876</link>
<pubDate>Tue, 05 Sep 2006 15:09:45 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ 
A wind-collecting unit, above, stands more than 60 feet tall outside Blairsburg, Iowa, where one of the largest wind power experiments in the U.S. dots the landscape. 
 ]]></content:encoded>
<description>
A wind-collecting unit, above, stands more than 60 feet tall outside Blairsburg, Iowa, where one of the largest wind power experiments in the U.S. dots the landscape. 
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/4876</guid>
</item>
            <item>
<title>Elk River (KS) After</title>
<link>http://www.windaction.org/articles/4255</link>
<pubDate>Thu, 03 Aug 2006 16:16:55 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[  ]]></content:encoded>
<description></description>
<guid isPermaLink="true">http://www.windaction.org/articles/4255</guid>
</item>
            <item>
<title>Elk River (KS) Before</title>
<link>http://www.windaction.org/articles/4254</link>
<pubDate>Thu, 03 Aug 2006 16:15:32 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[  ]]></content:encoded>
<description></description>
<guid isPermaLink="true">http://www.windaction.org/articles/4254</guid>
</item>
            <item>
<title>Turbine Construction - Spearville Wind Plant</title>
<link>http://www.windaction.org/articles/4008</link>
<pubDate>Wed, 19 Jul 2006 11:28:25 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ A crane gets ready to place the third section on a wind tower at the site of the Spearville Wind Energy Facility, which will have 67 towers and generate 100.5 megawatts of power when completed in October. By  ]]></content:encoded>
<description>A crane gets ready to place the third section on a wind tower at the site of the Spearville Wind Energy Facility, which will have 67 towers and generate 100.5 megawatts of power when completed in October. By </description>
<guid isPermaLink="true">http://www.windaction.org/articles/4008</guid>
</item>
            <item>
<title>Wind turbines in Gray County</title>
<link>http://www.windaction.org/articles/2111</link>
<pubDate>Sun, 19 Mar 2006 13:52:08 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Wind turbines in Gray County are silhouetted against the setting sun in this 2004 file photo. The turbines shut down automatically when wind gusts are up to about 56 mph. ]]></content:encoded>
<description>Wind turbines in Gray County are silhouetted against the setting sun in this 2004 file photo. The turbines shut down automatically when wind gusts are up to about 56 mph.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/2111</guid>
</item>
            <item>
<title>Ellis County Zoning: anticipating the opportunity for personal gain</title>
<link>http://www.windaction.org/articles/24206</link>
<pubDate>Fri, 20 Nov 2009 18:13:28 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ The one piece of business discussed by the commission came from Commissioner Keith Campbell. Mr. Campbell proposed that the commission adopt a bylaw which said that when considering board business, if a commissioner &quot;anticipated the opportunity&quot; to personally benefit by the action of the board in the value of $1000 or more, that commissioner should publicly state that. ...Because of the avowed interest of some current and past members of the zoning commission in securing personal contracts with corporations seeking to put wind energy conversion systems in Ellis County, some members of the public were interested in greater transparency in the operation of the zoning board. ]]></content:encoded>
<description>The one piece of business discussed by the commission came from Commissioner Keith Campbell. Mr. Campbell proposed that the commission adopt a bylaw which said that when considering board business, if a commissioner &quot;anticipated the opportunity&quot; to personally benefit by the action of the board in the value of $1000 or more, that commissioner should publicly state that. ...Because of the avowed interest of some current and past members of the zoning commission in securing personal contracts with corporations seeking to put wind energy conversion systems in Ellis County, some members of the public were interested in greater transparency in the operation of the zoning board.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/24206</guid>
</item>
            <item>
<title>Kansas Supreme Court upholds ban on commercial wind farms in scenic Flint Hills</title>
<link>http://www.windaction.org/articles/23878</link>
<pubDate>Fri, 30 Oct 2009 00:12:49 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ In a case pitting the beauty of the Flint Hills against large wind farms, the Flint Hills won.

The Kansas Supreme Court ruled Friday in favor of a zoning ordinance in Wabaunsee County that prohibits commercial wind farms.

Poised as the third best state in the country for wind power and on the cusp of a renewable energy revolution, Kansas has the potential to be at the epicenter of the wind industry.

 ]]></content:encoded>
<description>In a case pitting the beauty of the Flint Hills against large wind farms, the Flint Hills won.

The Kansas Supreme Court ruled Friday in favor of a zoning ordinance in Wabaunsee County that prohibits commercial wind farms.

Poised as the third best state in the country for wind power and on the cusp of a renewable energy revolution, Kansas has the potential to be at the epicenter of the wind industry.

</description>
<guid isPermaLink="true">http://www.windaction.org/articles/23878</guid>
</item>
            <item>
<title>Wind speeds in Kansas show slow down, study says</title>
<link>http://www.windaction.org/articles/22240</link>
<pubDate>Mon, 20 Jul 2009 11:21:46 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ How about this for a new state slogan: Kansas, not as windy as you think?

A study of long-term wind speed trends suggests just that - winds across the United States, in Kansas and a few other states in particular, have been steadily decreasing since 1973. The study, to be published in August in the Journal of Geophysical Research, is the first of its kind in the U.S.

Using data from wind monitors, the study found that winds had slowed across the U.S. by about 10 percent over 30 years.
 ]]></content:encoded>
<description>How about this for a new state slogan: Kansas, not as windy as you think?

A study of long-term wind speed trends suggests just that - winds across the United States, in Kansas and a few other states in particular, have been steadily decreasing since 1973. The study, to be published in August in the Journal of Geophysical Research, is the first of its kind in the U.S.

Using data from wind monitors, the study found that winds had slowed across the U.S. by about 10 percent over 30 years.
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/22240</guid>
</item>
            <item>
<title>Closed meetings could be violation</title>
<link>http://www.windaction.org/articles/21657</link>
<pubDate>Sat, 20 Jun 2009 13:04:24 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Details about how much local government money could flow to the proposed Siemens Wind Power plant in Hutchinson have not fully emerged. And that could amount to a violation of the Kansas Open Meetings Act. ...However, the contract between Siemens and the participating parties - to include Reno County and the cities of Hutchinson and South Hutchinson - continues to be finalized in secret. ]]></content:encoded>
<description>Details about how much local government money could flow to the proposed Siemens Wind Power plant in Hutchinson have not fully emerged. And that could amount to a violation of the Kansas Open Meetings Act. ...However, the contract between Siemens and the participating parties - to include Reno County and the cities of Hutchinson and South Hutchinson - continues to be finalized in secret.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21657</guid>
</item>
            <item>
<title>Will wind energy follow ethanol's path?</title>
<link>http://www.windaction.org/articles/21540</link>
<pubDate>Thu, 11 Jun 2009 05:52:45 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Wind power is booming -- at the moment.
Companies are flocking to build turbine and blade plants in the United States, such as the one Siemens will build in Hutchinson. The amount of energy harvested from wind rose 50 percent last year to 25,300 megawatts.

For the people in the ethanol industry, it must sound sadly like deja vu.
 ]]></content:encoded>
<description>Wind power is booming -- at the moment.
Companies are flocking to build turbine and blade plants in the United States, such as the one Siemens will build in Hutchinson. The amount of energy harvested from wind rose 50 percent last year to 25,300 megawatts.

For the people in the ethanol industry, it must sound sadly like deja vu.
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21540</guid>
</item>
            <item>
<title>Light breeze, heavy goal</title>
<link>http://www.windaction.org/articles/21552</link>
<pubDate>Thu, 11 Jun 2009 04:27:46 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ There's been a major shift in the direction of Hutchinson's Sunflower Wind, but company officials say production at the wind turbine manufacturing plant is still on the horizon.

Rather than the planned 2.5-megawatt turbines with 180-foot-long blades, the company is working to produce 100-kilowatt wind turbines that require only low wind speeds to power small commercial buildings, schools, hospitals or industrial plants.
 ]]></content:encoded>
<description>There's been a major shift in the direction of Hutchinson's Sunflower Wind, but company officials say production at the wind turbine manufacturing plant is still on the horizon.

Rather than the planned 2.5-megawatt turbines with 180-foot-long blades, the company is working to produce 100-kilowatt wind turbines that require only low wind speeds to power small commercial buildings, schools, hospitals or industrial plants.
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21552</guid>
</item>
            <item>
<title>Route change sought </title>
<link>http://www.windaction.org/articles/21229</link>
<pubDate>Fri, 15 May 2009 21:24:22 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ The message Thursday evening was loud and clear: Adjustments need to be made to the location of a proposed power line stretching from Spearville to Hays. 

The reasons for moving the lines varied, however, from aesthetics to interfering with a proposed wind farm in central Rush County. 

It was just as clear that landowners don't consider a one-time, up-front lump payment for easements as fair.  ]]></content:encoded>
<description>The message Thursday evening was loud and clear: Adjustments need to be made to the location of a proposed power line stretching from Spearville to Hays. 

The reasons for moving the lines varied, however, from aesthetics to interfering with a proposed wind farm in central Rush County. 

It was just as clear that landowners don't consider a one-time, up-front lump payment for easements as fair. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/21229</guid>
</item>
            <item>
<title>Next step for proposed wind farm remains an uncertainty </title>
<link>http://www.windaction.org/articles/21199</link>
<pubDate>Wed, 13 May 2009 00:58:02 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Plaintiffs contacted by The Hays Daily News, however, say they have not signed the document, with at least one implying their intent is to do so. 

While some question has been posed as to whether the county commission should have made the document public before the other signatures were obtained, Davidson said it was within the county's rights to take action. 
 ]]></content:encoded>
<description>Plaintiffs contacted by The Hays Daily News, however, say they have not signed the document, with at least one implying their intent is to do so. 

While some question has been posed as to whether the county commission should have made the document public before the other signatures were obtained, Davidson said it was within the county's rights to take action. 
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21199</guid>
</item>
            <item>
<title>Wind plaintiffs say not so fast</title>
<link>http://www.windaction.org/articles/21179</link>
<pubDate>Tue, 12 May 2009 01:00:13 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ In a unanimous decision at Monday's meeting, Ellis County Commissioners endorsed terms of settlement in a lawsuit regarding a wind farm southwest of Hays. 

While commissioners said the settlement could bring closure to the hotly disputed wind farm controversy, lawsuit plaintiffs might not be so sure.  ]]></content:encoded>
<description>In a unanimous decision at Monday's meeting, Ellis County Commissioners endorsed terms of settlement in a lawsuit regarding a wind farm southwest of Hays. 

While commissioners said the settlement could bring closure to the hotly disputed wind farm controversy, lawsuit plaintiffs might not be so sure. </description>
<guid isPermaLink="true">http://www.windaction.org/articles/21179</guid>
</item>
            <item>
<title>Settlement paves way for wind farm</title>
<link>http://www.windaction.org/articles/21155</link>
<pubDate>Mon, 11 May 2009 18:53:16 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ After years of discussion and a lengthy legal battle, it appears Ellis County soon could be home to a 200-megawatt wind farm. 

In a unanimous decision, the Ellis County Commission today approved a settlement in the case of Davis v. Ellis County regarding a proposed project southwest of Hays. 

The agreement holds that the conditional-use permit commissioners granted for the project is lawful and enforceable, meaning the wind farm could proceed.
 ]]></content:encoded>
<description>After years of discussion and a lengthy legal battle, it appears Ellis County soon could be home to a 200-megawatt wind farm. 

In a unanimous decision, the Ellis County Commission today approved a settlement in the case of Davis v. Ellis County regarding a proposed project southwest of Hays. 

The agreement holds that the conditional-use permit commissioners granted for the project is lawful and enforceable, meaning the wind farm could proceed.
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21155</guid>
</item>
            <item>
<title>Rival high-voltage power lines proposed for carrying Kansas wind power out of state</title>
<link>http://www.windaction.org/articles/21129</link>
<pubDate>Fri, 08 May 2009 12:17:22 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ A high-voltage power line unlike any seen this side of the Mississippi River soon could be striding across southwestern Kansas.
Cable bundles as thick as pickup tires and bearing 765,000 volts would bind the ever-more-productive wind fields of Kansas to outside markets.

The project, estimated to be worth up to $800 million, is still up for grabs between two competing groups that could get the lines up and humming by 2013. ...Nearly 1,012 megawatts from wind turbines will be available by the end of 2009, but 7,000 megawatts are proposed for western Kansas by 2030.
 ]]></content:encoded>
<description>A high-voltage power line unlike any seen this side of the Mississippi River soon could be striding across southwestern Kansas.
Cable bundles as thick as pickup tires and bearing 765,000 volts would bind the ever-more-productive wind fields of Kansas to outside markets.

The project, estimated to be worth up to $800 million, is still up for grabs between two competing groups that could get the lines up and humming by 2013. ...Nearly 1,012 megawatts from wind turbines will be available by the end of 2009, but 7,000 megawatts are proposed for western Kansas by 2030.
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21129</guid>
</item>
            <item>
<title>City passes protection for airspace</title>
<link>http://www.windaction.org/articles/21062</link>
<pubDate>Tue, 05 May 2009 20:55:39 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ An energy company hoping to establish a wind farm in Pratt County will have to keep its 400-foot towers about three and a half miles from approaches to the Pratt Industrial Airport, but that news should come as no surprise to Indeck Energy Services. ]]></content:encoded>
<description>An energy company hoping to establish a wind farm in Pratt County will have to keep its 400-foot towers about three and a half miles from approaches to the Pratt Industrial Airport, but that news should come as no surprise to Indeck Energy Services.</description>
<guid isPermaLink="true">http://www.windaction.org/articles/21062</guid>
</item>
            <item>
<title>Forum focuses on wind, worries </title>
<link>http://www.windaction.org/articles/20867</link>
<pubDate>Wed, 22 Apr 2009 15:16:32 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Much of the discussion at a wind energy forum Tuesday night at Fort Hays State University revolved around the same arguments both proponents and opponents of the alternative energy in Ellis County have maintained all along. 

The one thing the forum's three panelists could agree on was that reducing energy consumption is needed. 
 ]]></content:encoded>
<description>Much of the discussion at a wind energy forum Tuesday night at Fort Hays State University revolved around the same arguments both proponents and opponents of the alternative energy in Ellis County have maintained all along. 

The one thing the forum's three panelists could agree on was that reducing energy consumption is needed. 
</description>
<guid isPermaLink="true">http://www.windaction.org/articles/20867</guid>
</item>
            <item>
<title>Hamilton County on track for new wind farm </title>
<link>http://www.windaction.org/articles/20823</link>
<pubDate>Sun, 19 Apr 2009 07:37:24 GMT</pubDate>
<content:format rdf:resource="http://www.w3.org/1999/xhtml" />
<content:encoded><![CDATA[ Nikki Schwerdfeger won't believe it until she sees the blades spinning.

The Hamilton County landowner remains cautiously optimistic about the proposed 135-megawatt wind farm about to be developed near her rural Coolidge home. 

One of the landowners who signed a lease for erecting wind turbines on their property, she has yet to learn if any of the around 90, 262-foot-tall turbines will spin on her land.

 ]]></content:encoded>
<description>Nikki Schwerdfeger won't believe it until she sees the blades spinning.

The Hamilton County landowner remains cautiously optimistic about the proposed 135-megawatt wind farm about to be developed near her rural Coolidge home. 

One of the landowners who signed a lease for erecting wind turbines on their property, she has yet to learn if any of the around 90, 262-foot-tall turbines will spin on her land.

</description>
<guid isPermaLink="true">http://www.windaction.org/articles/20823</guid>
</item>
   </channel>
</rss>
