Home | Contact | Text size: s M L
facts, analysis, exposure of wind energy's real impacts
Steelwinds turbines undergo repair -- again
May 12, 2009
Credits: David Accardi
Description:
Turbines at the Steelwinds facility in Lackawanna, New York are undergoing substantial repair -- again. The Steelwinds Project went online in the summer 2007 with eight Clipper 2.5 megawatt turbines. The project was the first to use the Clipper units, touted as the new standard for reliable performance. By late summer 2007, the facility was shut down due to damage in the turbine gear boxes (http://www.windaction.org/news/13133 ) The repairs occurred in early 2008. This photo taken May 12, 2009 shows the facility down again. First Wind, formerly UPC Wind, has provided no information on the root cause of the turbine failure.
Steelwinds turbines undergo repair -- again
Click to download full sized image
File name: Steelwinds_repairs.JPG
File size: 1.94 MB
Width x Height:3264 x 2448 pixels
Note: this image may be subject to the Fair Use Notice.
Options :
View Archives