Mars Hill 2006 (under construction)
July 28, 2007
Credits: Dan Boone
Credits: Dan Boone
Description:
All the roads and pads installed; most turbine bases present.
The roads measure nearly 100 feet wide, and the cleared areas likely average 4-5 acres per turbine. As much as 1-square mile of forest interior was lost due to the "edge effects" caused by the extensive fragmentation of the Mars Hill forest by this project's infrastructure.
Click to download full sized image
| File name: | 2006 mars hill.jpg |
| File size: | 230.94 kB |
| Width x Height: | 997 x 691 pixels |
Note: this image may be subject to the Fair Use Notice.
- Options :
- View Archives



